GMHBA Stadium – Stage 5
Fabritecture
The GMHBA Stadium – Stage 5 project revolved around the design, fabrication, and installation of 17 PTFE roof infills, measuring 1,417m2, meticulously crafted to maintain the stadium's architectural integrity and visual coherence. Each PTFE roof infill was carefully tailored to align seamlessly with the existing roofing structure, preserving design continuity from prior construction phases. With …