Company:
Eide Industries, Inc.

Project Details

Fabric 1

Serge Ferrari FT 381 Precontraint
Producer/Manufacturer: Serge Ferrari North America Inc.
Primary Use: Main Fabric


Engineer Name 1
Hany Messiha

Engineer Company 1
Messiha Engineering Services, Inc.

Architect Name
Trevor Abramson

Architect Company
Abramson Architects

Fabrication Name
Tamer Shenoda

Fabrication Company
Trussworks International

Subcontractor Name
Angela Juarez

Subcontractor Company
Eide Industries, Inc.

Project Manager Name
Rick McBride

Project Manager Company
Eide Industries, Inc.

Installation Name
Albert Soto

Installation Company
Eide Industries, Inc.


Please describe the project specifications

Eide Industries, Inc. was contracted by Trussworks International to furnish custom fabric panels as part of the exterior facade for a large canopy located in the main courtyard of the Aaron Milken Center in Los Angeles. The main freestanding canopy, built by Trussworks International, measures 128'-0" long x 56'-0" wide x 34'-6" high, and is engineered to withstand wind loads up to 110 MPH.

Eide supplied and installed fabric facades on one hundred fifty-eight (158) pre-fabricated panel frames, covering a total surface area of 8,640 square feet. This project consisted of one hundred twelve (112) panels at 8'-0" x 8'-0" and forty-six (46) panels at 4'-0" x 8'-0". White, flame-retardant Serge Ferrari FT 381 Precontraint mesh fabric was tensioned and attached to each frame utilizing Facid M components to create an alternating shade pattern across the top, bottom, and side elevations of the canopy enhancing both aesthetics and sun protection for the courtyard space.