Company:
Technotense
Project Details
Fabric 1
FRONTSIDE VIEW 381
Producer/Manufacturer:
Serge Ferrari North America Inc.
Primary Use:
Main Fabric
Engineer Name 1
Gerardo Amezcua
Engineer Company 1
Technotense
Design Name
Cesar Eloy Perez
Design Company
Technotense
Architect Name
Sadrac Siguenza
Architect Company
Idea Asociados
Fabrication Name
Eduardo Moreno
Fabrication Company
Technotense
Subcontractor Name
Roberto Flores
Subcontractor Company
Basa
Project Manager Company
Ximetria
Installation Name
Antonio Alaniz
Installation Company
Technotense
Please describe the project specifications
We designed this façade with an eye toward taking care of every detail of the finishing. The idea was to create an illuminated façade on which the JW Marriot logo would appear. Idea Associates was responsible for the design of the building and the result is incredible.
What is unique or complex about the project?
We design the steel frame to fix the membrane and the system to do it in a very clean and simple way to get perfect lines between panels, the installation took 12 weeks from steel to membrane.
Content is submitted by the participant. IFAI is not responsible for the content descriptions of the IAA award winners.