Company:
Technotense
Project Details
Fabric 1
SIOEN T0117F
Producer/Manufacturer:
OTHER
Primary Use:
Main Fabric
Engineer Name 1
GERARDO AMEZCUA
Engineer Company 1
Technotense
Design Name
TT Design Team
Design Company
Technotense
Architect Name
CESAR ELOY PEREZ
Architect Company
Technotense
Fabrication Name
Eduardo Moreno
Fabrication Company
Technotense
Installation Name
Antonio Alaniz
Installation Company
Technotense
Please describe the project specifications
The main plaza between the library, the new pavilion, and the cinema needs a protected path to connect the in-between , for this, the solution needs to be done in a short period of time while the main pavilion was done, we design a curved shaped hallway with the join of several hyperbolic paraboloids that gives a nice touch of design and make the way more enjoyable.
What is unique or complex about the project?
This project was done in a period of 4 weeks from design to buit and the fabric was installed in just one week for the 2,200 sqm our team was perfectly synchronized and organized to deliver the project on time for the event.